Cosmic rays are streams of high-energy particles accelerated by galactic or extragalactic astronomical sources which, striking the Earth’s atmosphere from every direction in space, multiply through successive interactions with the atoms and molecules that make up the atmosphere, creating veritable cascades of secondary particles. The experiment, carried out by the Department of Energy (DOE) under a collaboration agreement between the DOE and NASA, is managed by an international collaboration comprising 16 countries (Finland, France, Germany, Italy, the Netherlands, Portugal, Spain, Switzerland, Romania, Russia, Turkey, China, Korea, Taiwan, Mexico and the United States) and has involved numerous scientists, engineers, technicians and students for almost two decades.
In August 2010, AMS-02 was transported to the Kennedy Space Center aboard a special Air Force cargo aircraft and was launched by NASA towards the ISS as the main payload aboard the final mission of the Space Shuttle Endeavour (STS-134), on 16 May 2011.
The crew of the STS-134 mission then installed AMS as an external instrument on the ISS on 19 May 2011 and, following a calibration phase, immediately began measuring primary cosmic rays in space, transmitting the data to the AMS Payload Operations Control Center (POCC), located within CERN.
Thanks also to the experience gained over the years with the particle accelerators of the Frascati National Laboratories and at CERN, Italy made an important contribution to the construction of the detector as well as to the analysis of the recorded data. In particular, under the guidance of INFN and ASI, Italy was entrusted with the production of the main instruments installed aboard AMS.
Galli e Morelli’s contribution to this experiment consisted in the production of a special support, called the “gondola”, on which AMS-02 was installed during the Thermo Vacuum Test, the test designed to study the thermal behaviour of the AMS-02 electronic units in an environment able to simulate the thermal conditions of space.
The support, built with non-magnetic steel, insensitive to the magnetic field of AMS-02, required the machining of numerous parts that were only subsequently assembled to obtain the final product.
Conversely, some machine-tool operations were carried out on the already assembled structure, so as to achieve the high degree of precision required by the technical specifications.
Galli e Morelli coordinated all the phases of the “gondola’s” production, from the procurement of the raw materials, the production and testing of the individual parts, through to the assembly and the final testing phase of the finished support (which also included the structural load test).
Taking part in a project of such importance was a genuine challenge for Galli e Morelli, especially in light of the ambitious parameters required in terms of tolerances, precision and finishes of the mechanical machining. These results were fully achieved thanks to the passion, the high technical expertise and the experience of the entire workshop team.