Case study

E-TEST

Mechanical structures for advanced vibration isolation systems

The European E-TEST project arises within the technological development for the future Einstein Telescope, the third-generation gravitational detector intended to surpass the performance of current gravitational-wave interferometers.

Within the project, an advanced technology demonstrator was developed for the Centre Spatial de Liège (CSL), designed to test high-precision mechanical and cryogenic systems. The prototype involves the suspension of a 100 kg monolithic silicon mirror cooled to about 25 Kelvin by means of a sophisticated multi-stage vibration isolation system.

In 2023, Galli e Morelli won the European tender launched by Nikhef (National Institute for Subatomic Physics) for the production of the aluminium mechanical structures intended for the vibration isolation system (VIS) and the cryogenic platform (CP) of the E-TEST prototype.

The supply included complex mechanical components relating to the main subsystems of the isolation system:

  • active platform;
  • inverted pendulum;
  • geometric anti-spring filter (GAS);
  • marionette;
  • cryogenic platform.

One of the most critical elements of the project concerned the compatibility of the components with Ultra High Vacuum (UHV) environments, with residual pressures on the order of 10-9 mbar.

To meet these requirements, rigorous production and control procedures were adopted, including:

  • exclusive use of certified virgin materials;
  • a ban on the use of recycled materials or castings containing porosity;
  • high-precision machining with specific surface-roughness requirements;
  • strict control of the machining lubricant fluids;
  • advanced washing and decontamination procedures;
  • specific protective packaging for UHV environments.

Particular attention was devoted to the TIG welding on aluminium alloys, carried out with full penetration according to the ISO 3834-2 standard and designed to avoid microcavities or “virtual leaks” incompatible with ultra-high vacuum applications.

The project also required:

  • high geometric precision;
  • control of surface contamination;
  • processes compatible with advanced scientific environments;
  • documentation and quality management compliant with the standards required by the client.

Taking part in the E-TEST project was an important confirmation for Galli e Morelli of its expertise in the production of advanced mechanical components intended for cutting-edge scientific infrastructures, and it consolidated the company’s role in the field of precision engineering for high-technology applications.