Skip to main content

Galli e Morelli

Case study

GEMINI / ETIC

Mechanical platforms for advanced seismic isolation systems

The GEMINI – ETIC project arises within the technological development activities for the future Einstein Telescope (ET), the new-generation European gravitational detector promoted by ETIC (Einstein Telescope Infrastructure Consortium) and coordinated in Italy by the INFN as part of the National Recovery and Resilience Plan (PNRR).

The experiment is dedicated to the development of advanced technologies for the isolation and control of vibrations, as well as to the experimental validation of new inertial sensors intended for the future infrastructures for the detection of gravitational waves. The project also includes research activities related to the Lunar Gravitational-wave Antenna (LGWA), aimed at developing instrumentation operating in extreme cryogenic conditions and in environments comparable to permanently shadowed lunar regions.

In 2023, Galli e Morelli won the supply of two mechanical platforms for the GEMINI – ETIC experiment, intended for the INFN Gran Sasso National Laboratories.

The platforms, technically named ISI (Seismic Isolation System), are multi-axis passive-active seismic isolation systems designed to operate under vacuum inside dedicated experimental chambers. Each platform consists of a two-level structure:

  • a “Stage 0”, constrained to the ground by means of dedicated supports;
  • a “Stage 1”, elastically suspended by means of a system of flexible blades (“Blade System”);
  • an upper “Optical Table” intended for the installation of the scientific instrumentation.

The technical project documentation derives directly from the international LIGO (Laser Interferometer Gravitational-Wave Observatory) experiment and was developed according to ASME standards, with dimensions and tolerances expressed in inches.

The supply required:

  • high-precision CNC machining;
  • the production of complex mechanical structures;
  • rigorous dimensional checks;
  • cleaning procedures compatible with vacuum environments;
  • complete assembly and functional checks before final delivery.

Particular attention was devoted to the planning of the production activities and to the management of the intermediate checks, carried out in close collaboration with the client. Each manufacturing phase was accompanied by dimensional checks and assemblability verifications aimed at ensuring the full conformity of the components with the technical project specifications.

The platforms were also subjected to cleaning procedures using high-purity isopropyl alcohol, according to the specifications envisaged for components intended for scientific environments operating under vacuum.

Taking part in the GEMINI – ETIC project is a further confirmation for Galli e Morelli of its expertise in the production of advanced mechanical systems for cutting-edge scientific infrastructures, consolidating the company’s experience in the field of vibration isolation, gravitational physics and high-precision applications intended for international research.